1) This quotation is
subject to acceptance within 30 days. If the customer requests postponement
of the start of installation, one month or longer after MJC Plumbing
is ready to proceed, the price quoted is no longer valid.
2) If the installation work has to be suspended or varied at the
customers request, or if the customer requires work on the system
to be carried out outside of normal working hours, MJC Plumbing
shall be entitled to make a reasonable additional charge for the
extra cost incurred.
3) In the event that during the course of the work Asbestos or any
substance of a hazardous or potentially hazardous nature is discovered,
MJC Plumbing will comply with local or national regulations, or
other requirements that may need to be observed before work continues.
If this results in additional work over that which this estimate
is given to cover, an additional charge may be made. However, if
the appropriate course of action is for the material to be left
in place without alteration or additional work, MJC Plumbing will
not be responsible for any work involved in removal, should this
be required, the customer will be responsible for leaving the working
area safe.
4) MJC Plumbing accepts no liability for any delay in completing
the work due to circumstances beyond our control. Appointments are
given in good faith, of which we try to keep.
5) Any quotation is given and the installation undertaken by MJC
Plumbing on the condition that any necessary licenses, authorities
or permissions, including the consent of the Landlord or Local Council,
are first obtained by the customer.
6) The customer will give unrestricted access to the house and grounds
in order that the installation work may be undertaken. MJC Plumbing
reserves the right to make additional charges for such delays.
7) All MJC Plumbing materials whilst on the customers premises whether
fixed or unfixed are at the sole risk of the customer. MJC Plumbing
expects the customer to take reasonable care in protecting such
items.
In the event of any materials being damaged, destroyed or stolen
due to negligence, MJC Plumbing will pursue full repayment. Also
for any materials/ work removed, damaged or destroyed, whilst in
the customers care the cost of replacing any such materials or reinstating/
restoring such works shall be charged as an extra.
The customer shall not be responsible for any loss occasioned solely
by the negligence of MJC Plumbing’s employees or contractors.
8) The work will be carried out in a professional manner. MJC Plumbing
cannot, however, be held responsible for any damages to decorations,
fittings, existing pipe work, cylinders or tanks caused during the
normal course of installing or removing fixtures and fittings. Note:
although rare, responsibility cannot be taken for leaks or airlocks
that may occur on systems as a result of “Powerflushing”
or Installing Pressurised Systems.
9) Although every care is taken when taking up carpets, wooden floor
boards and other flooring covering MJC Plumbing cannot be held responsible
for any damage whilst carrying out this work.
10) On signing this quotation the customer accepts that there may
be unforeseen circumstances and works that may not be apparent at
the time of our survey.
Remedial of these works shall become chargeable if undertaken by
MJC Plumbing.
11) If the customer supply’s their own materials they will
be responsible for any missing parts or faults. MJC Plumbing reserve
the right to charge for any extra time incurred.
12) If you instruct us to do works or buy materials and then cancel,
we reserve the right to charge you for the cost of any time and
materials incurred by us. Charges will be those of our normal terms
and conditions.
13) Guarantee. We have a 6 Year guarantee period of our labour and
the duration of the manufacturers guarantee for all parts or equipment
supplied by us. If you are not satisfied with our work, you must
contact us, in writing, within 12 months of finishing the work and
let us come and inspect the work and carry out the necessary remedial
work at our expense.
14) You agree that if you do not contact us within 12 months we
shall have no liability. You agree to let our insurers inspect any
works carried out by us.
15) These terms and conditions may not be released, discharged,
supplemented, interpreted, varied or modified in any manner except
by an instrument in writing signed by our duly authorised representative
and you. Our terms and conditions shall prevail over any terms and
conditions used by you or contained, set out or referred to in any
documentation sent to us by you. By entering into a contract with
us you agree irrevocably to waive the application of any of these
terms and conditions.
16) These terms and conditions and all contracts awarded between
us and you shall be governed and construed in accordance with English
Law and shall be subjected to the exclusive jurisdiction of the
English Law.
17) All balances for works will become due upon completion/ commissioning,
in full by Debit/ Credit card payment or via Internet/ telephone
Banking Transfer.
An Interest of 4% will be charged on outstanding amounts owed to
us.
Jobs on an hourly rate. The total charge to you will be the time
spent by our representative doing the work. It will include all
reasonable time spent in obtaining materials. Jobs are charged by
the whole hour. |
|

|
| |
 |
|